sedan · 2024–2026
Tesla Model 3 Long Range AWD: charging cost and time
A 75 kWh battery (usable) and 629 km of WLTP range give about 11.9 kWh per 100 km. A full charge at home takes roughly 10.1 hours on a 7.4 kW wallbox and costs between $4.75 and $37.25 depending on where you live.
Specifications
| Battery | 75 kWh (usable) |
|---|---|
| Rated range | 629 km WLTP |
| Efficiency | 11.9 kWh/100 km (8.4 km per kWh) |
| Max AC charging | 11 kW |
| Max DC charging | 250 kW |
| Connector | NACS |
What a full charge costs
Energy delivered = 75 kWh × 1.10 for AC charging losses = 82.5 kWh from the grid. Per 100 km uses the same 10% loss.
| Country · price | Full charge | Per 100 km |
|---|---|---|
| United States · $0.184/kWh | $15.21 | $2.41 |
| United Kingdom · $0.359/kWh | $29.62 | $4.7 |
| Germany · $0.452/kWh | $37.25 | $5.91 |
| India · $0.058/kWh | $4.75 | $0.754 |
| Bangladesh · $0.074/kWh | $6.12 | $0.971 |
How long a charge takes
- Home, 7.4 kW single-phase wallbox (car limit 11 kW): about 10.1 hours from empty to full.
- Three-phase 11 kW: about 6.8 hours.
- Standard 2.3 kW socket: about 33 hours — overnight covers 193 km of range.
- DC fast charging 10–80% at 250 kW peak (≈ 70% average): about 18 minutes.
Calculate for your own rate and trip
- Charging cost with your electricity rate
- Charging time on your charger
- Real-world range in winter or at speed
- Running cost versus a petrol car
Source
Figures from Tesla (some values are commonly cited rather than published; marked approximate). Range figures are laboratory ratings; real consumption varies 10–30% with speed, temperature, and load.
